LAWS OF MALAYSIA
FACTORIES AND MACHINERY ACT 1967 [ACT 139]
P.U.(A) 328/86
FACTORIES AND MACHINERY (BUILDING OPERATIONS AND WORKS OF ENGINEERING CONSTRUCTION) (SAFETY) REGULATIONS 1986
PART XII - EXCAVATION WORK
Regulation 113. General requirements.
- No employee shall be permitted to enter any excavated area unless sheet piling, shoring or other safeguards that may be necessary for his protection are provided.
- The excavation site and its vicinity shall be checked by a designated person after every rainstorm or other hazard-increasing occurance and the protection against slides and cave-ins shall be increased, if necessary.
- Temporary sheet piling installed to permit the construction of a retaining wall shall not be removed until the wall has developed its full strength.
- Where banks are undercut adequate shoring shall be provided to support the ovechanging materials.
- Excavated materials and other superimposed load shall be placed at least 610 millimetres from the edge of open excavation and trenches , and shall be so piled or retained that no part thereof can fall into the excavation, or cause the banks to slip or cause the upheaval of the excavation bed.
- Banks shall be stripped of loose rocks or other materials which may slide, roll or fall upon persons below.
- Open sides of excavations where a person may fall more than 3 metres shall be guarded by adequate barricades and suitable warning signs shall be put up at conspicuous positions.
- No employee shall be permitted to work where he may be struck or endangered by an excavating machine or by material dislodged by it or falling from it